
Water Treatment Information from the blog of Neo Performance Materials, a Wastewater Treatment Plant Chemicals Company.


Dosing WaterFX300 In Primary Clarifiers
Achieving Discharge Seasonal Limits And Avoiding Capital Costs January 24, 2020 Summary Geneseo Wastewater Treatment Plant is a 1.5 MGD municipal facility in the Finger Lakes region in upstate New York with a seasonal total phosphorus (TP) limit of 1.0 mg/L. After...
Phosphorus Removal
Enhanced coagulation drives plant efficiency and performance The Challenge A 770,000 GPD municipal wastewater treatment plant discharging to a stream leading to Lake Erie was having difficulty meeting its total aluminum (1.1 mg/L) and total phosphorus (1.0 mg/L)...
Phosphorus Removal And Sludge Reduction
Sludge Reduction and Phosphorus Control Driven Simultaneously November 2020 Summary Coppermine WRF (water reclamation facility) serves an area in Paulding County Georgia, a rapidly growing suburb of Atlanta. With approximately 800,000 GPD average flow, this municipal...
WaterFX reduces chemical feeds
WaterFX reduces chemical feeds Removing phosphorus from wastewater can add a lot to your chemical feeds, and to your costs. First, there is the coagulant. If you are using aluminum or ferric-based coagulants, the amount of coagulant you add is often at least 4 to 1 in...